Earthworks May 2021 – Sunshine Beach Resort & Residences

May 2021: Earthworks

The first stage of the land cleaning and preparation is completed:

  • Devegetation was successfully completed.
  • Riverbanks were defined with stones to identify the border between the land and the river.
  • Inspectors from the Phuket Land Department have visited the construction site for the land survey and measurements.
  • At this stage, specific construction areas and boundaries of the land were determined.

Before the construction of foundation begins the soil will be backfilled, treated, and levelled.

Before the land clearing and devegetation:

On the first week of May devegetation and site clearing took place:

Video from construction site: https://www.youtube.com/watch?v=nvYvVJg-Pfs

On the second week, the riverbanks were defined with stones to identify the border between the land and the river. And on the third week, inspectors from the Phuket Land Department have visited the construction site for the land survey and measurements.